Licence number: 6116
Annual Return Start: 04 Dec 2001
Annual Return End: 03 Dec 2002
Date Received: 04 Feb 2003
 
Licence Condition numberType of non-complianceEPA actionsNo. of times occurred
M2.1 Monitoring of Combination 1 was not undertaken during the reporting period. N/A N/A
M2.1 Monitoring was not carried out at monitoring point 1 (Sediment Dam 3) as the licensee believes that the dam is not impacted nor has the potential to be impacted. N/A N/A